Displacement |
14 899 Tn full load |
|
Physical Dimensions |
|
Length: |
121.3 mts |
|
Beam: |
25.2 mts |
|
Draft: |
9.5 mts |
|
Top of mast
above waterline: |
42.2 mts |
|
Decks: |
12 |
|
|
Propulsion |
Type: Diesel-Electric |
|
4 motors Semt
Pielstick 8 PC-2.5 |
|
Diesel output 4 × 3
584 kW ( 19 500 hp ) |
|
4 generators 600 VCA
4 000 KVA |
|
2 double motors 700
VCC |
|
Shaft output: 2 × 5
950 kW (16 200 hp) |
|
Service Speed
|
Maximun |
17.2 knots |
|
Cruising |
14 knots |
|
Endurance |
60 days |
|
Complement |
Crew |
135 |
|
Passengers |
45 |
|
Transport Capacity |
1800 m³ |
|
Radar |
Air/Surface Search
AWS2 |
|
Navigation |
|
|
Helicopters |
Aft Deck and Hangar |
|
2 Helicopters Sea
King SH-3D o similar |
|
Boats on Board |
2 Hydrographic boats-Harding
boat |
|
2 EDPV |
|
Neumatic boats |
|
Ice Breaking
Capability |
Continuous |
ice thick: 1 m |
|
Ramming |
ice thick: 6 mts |
|
Builders |
OY Wärtsilä,
Helsinki, Finland |
|
Built at |
Wärtsilä Helsinki
Shipyard |
|
today Kvaerner Masa-Yards
Helsinki New Shipyard |
|
Keel laid |
July 4, 1977 |
|
Launched |
February 3, 1978 |
|
Delivered |
December 15, 1978 |
|
Trials |
winter 1979, Weddell
Sea, Antarctica |
|
First antarctic
campaign |
summer 1979-1980 |
The A.R.A. Almirante
Irizar was the first icebreaker with main engines placed
"one deck up"in order to give better open water
characteristics.
|
Sources: Argentine Navy / Kvaerner Masa-Yards
Inc. |
|